How to Calculate Wastewater Treatment Volume in Electroplating Production Lines
Author: Marisa
The calculation of wastewater treatment volume for electroplating production lines typically considers:
Water Consumption Method
Treatment Volume ≈ Total Water Intake × Recycling Ratio
(Recycling ratio usually 60%-90%, depends on water reuse system efficiency)
Tank Volume Method
Daily Volume(m³) = ∑(Tank Volume × Water Change Frequency × Number of Tanks)
Empirical Formula
Small/Medium Lines: 0.2-0.5 m³/m² (plated surface area)
Automated Lines: 0.1-0.3 m³/m²
Peak Flow Consideration
Apply simultaneous discharge factor (typically 0.6-0.8)
Typical Value: Conventional lines ~5-15 m³/day·standard production line
Note: Actual calculation should consider specific process parameters and local environmental regulations.